Environmental Compliance Compliance Checklist

Environmental compliance checklist for Indian businesses — pollution board consents, EPR for plastic and e-waste, hazardous waste returns, and environmental statements.

2
Consent
1
Environmental Statement
2
Hazardous Waste
2
Plastic EPR
ConsentOnce

Obtain Consent to Establish (CTE) from the State Pollution Control Board before construction of any red/orange/green category unit

Penalty: Closure direction + criminal prosecution u/s 15 EPA

Consent1–15 years

Obtain and renew Consent to Operate (CTO) before expiry (validity varies by category and state)

Penalty: Closure + power/water disconnection

Environmental StatementAnnual

Submit Form V environmental statement for FY to SPCB by September 30

Penalty: CTO revocation + prosecution

Hazardous WasteAnnual

Obtain HW authorisation and file annual return (Form 4) by June 30

Penalty: Fine + imprisonment up to 7 years under EPA

Hazardous WastePer movement

Maintain Form 3 records and manifest (Form 10) for every HW movement

Penalty: Authorisation cancellation

Plastic EPROnce + annual

Register as PIBO on the CPCB EPR portal if you introduce plastic packaging

Penalty: Environmental compensation per tonne

Plastic EPRAnnual

Meet annual EPR targets and file annual return on the plastic EPR portal by June 30

Penalty: Environmental compensation + portal blocking

E-WasteAnnual

Register on CPCB e-waste portal (producers/manufacturers/recyclers) and meet collection targets

Penalty: Environmental compensation

E-WasteAnnual

File e-waste annual returns on the portal by June 30

Penalty: Registration suspension

Battery WasteAnnual

Comply with Battery Waste Management Rules 2022 EPR obligations (if batteries placed on market)

Penalty: Environmental compensation

Bio-MedicalAnnual

Obtain BMW authorisation and file annual BMW report (healthcare operations)

Penalty: Fine up to ₹1 lakh/day

Water CessMonthly/Annual

Install water meters and submit water consumption returns where applicable

Penalty: Interest + penalty on unpaid cess

Air/Water MonitoringMonthly/Quarterly

Conduct stack emission and effluent monitoring at SPCB-notified frequency; install OCEMS for 17-category industries

Penalty: CTO suspension

Stubble/NoiseOngoing

Comply with noise limits for DG sets and construction equipment (acoustic enclosures, timing restrictions)

Penalty: Equipment sealing + fine

Green CoverOngoing

Maintain green belt as per CTE/CTO conditions

Penalty: Consent renewal refusal

EIAOnce + compliance reports

Obtain prior Environmental Clearance for projects under EIA Notification 2006 (Schedule projects)

Penalty: Project closure + demolition risk

EC ComplianceHalf-yearly

Submit half-yearly EC compliance reports to MoEFCC/SEIAA by June 1 and December 1

Penalty: EC revocation

Get automated deadline reminders for your environmental compliance business.

Run the free health check